Factory Tour
BUIT FOR SCALE.
DESIGNED FOR PRECISION.
50,000㎡ of manufacturing capability, less than 1 hour from Hong Kong International Airport. Tour our facility zone by zone.
Years of Experience
Production Lines
Factory Area
Employees
Annual Production
Our Facilities
A Complete Manufacturing Ecosystem
01
R&D Center
Full product development lab with material testing, vibration analysis, waterproof testing tanks, and a dedicated full - stack engineering team.
3D printing lab
Material testing room
Vibration measurement lab
Waterproof test facility
02
Tooling & Injection
In - house mold design and injection molding. 40 machines handling ABS, PC, medical - grade silicone, and TPE.
40 injection molding machines
In - house mold workshop
Material drying rooms
First article inspection bay
03
Silicone Division
Dedicated skin - safe silicone manufacturing with lSO Class 7 clean room for body - safe product production.
ISO Class 7 clean room
Silicone curing ovens
Trimming & finishing
Surface treatment
04
Assembly Lines
24 semi - automated assembly lines from compact vibrators to app - enabled couples' devices. Each line runs 100% function testing.
24 production lines
100% function test
Automated screw fastening
In - line QC stations
05
Quality Control Lab
Dedicated QC lab with drop testing, vibration life cycle testing, electrical safety testing, and AQL sampling stations.
AQL sampling rooms
Drop test equipment
Life cycle test rigs
EMC pre - compliance
06
Warehouse & Shipping
Dedicated skin - safe silicone manufacturing with lSO Class 7 clean room for body - safe product production.
FBA prep stations
Pick & pack lines
Freight loading dock
Temperature - controlled storage
Location Advantage
Zhuhai, China - Strategic Position
Our campus sits in the Guangdong - Hong Kong - Macao Greater Bay Area - China's most advanced manufacturing corridor. Positioned for fast freight access to HKG (Hong Kong International Airport), air freight to the USA is under 16 hours from our dock.
The Bay Area corridor gives us access to a deep supply chain for components, tooling, and raw materials - keeping lead times short and supply risk low.
<1
hr
To HKG Airport
~
16
hrs
Air freight to USA
3
Days
Sea freight to LA Port
24
hrs
Quote to response time
Ready to Start
VISIT OUR FACTORY
We welcome client visits year - round. Request an in - person factory tour and we'll
arrange everything.